CEMS by Uncloud БГ Open CEMS

For electricity producers · Market-price curtailment · Day-ahead · European bidding zones

Low and negative prices eat into the margin on a sunny day. CEMS stops your solar plant in exactly those hours.

In months of low prices, every MWh the plant sells earns twice as much on average.

What a MWh sells for BG · 60 kWp · invoices Jun 2024 – Sep 2026

+108%

higher price for every MWh sold, in months of low and negative prices The same plant, stopped under a 15 €/MWh floor, against left running through every hour — at the price its trader actually paid.

Curtailed
71.50 €/MWh
Left running
34.46 €/MWh
Strongest month · Apr 2026
×3.07

Price per MWh, curtailed and left running

When a plant left running sells under the floor

A month of low prices is one in which at least 40% of the energy would have sold under the floor, some of it below zero. Almost all of that energy is produced between 10:00 and 16:00 — when the sun is strongest and the price is lowest.

One real plant in Pleven province · How this was calculated

cemsAI Real questions about KBR-FS · Oct 2026

Ask about your own plants in plain words. cemsAI looks the answer up in their real production, prices, settings and inverters, and replies with figures you can trace.

Compare the two inverters of KBR-FS over the last 30 days. Is an inverter or a string falling behind?

Looked up · inverters and strings

From 17.09 to 16.10.2026, inverter INV-6T21B9031827 fell 94.28 kWh behind INV-6T2259042975. There is no clear sign of a string falling behind: the measured current deviations are between −1.1% and +1.8%.

What price did KBR-FS realise in September, against the daylight average, and why do they differ?

Looked up · the plant's month

109.60 EUR/MWh — 14.35 below the daylight average of 123.95. The plant produced most in the cheaper hours: the solar-weighted average was 103.98 EUR/MWh. Capture rate 88.4%.

Also asked

  • Do you have any advice on my floor? Is it set well, or should it change?
  • Which months had the most zero and negative prices over the last year?
  • Which inverter was the most productive this year, across all my plants?

Answers shortened, figures unchanged. Every figure is checked against the plant's data before it is shown. Translated from Bulgarian.

CEMS stops your plants when the day-ahead price falls under the floor you set, starts them again when it recovers, and reads the limit back off the hardware to prove both. The figures above are not a simulation of a typical plant: they come from the real work of a real plant, at the market's real prices.

Anyone can tell an inverter to stop. CEMS checks that it did. CEMS watches the day-ahead market, curtails your plants when the price drops under the floor you set, and then reads the power limit back off the hardware. When something moves that limit — another controller, a site EMS, somebody's phone — CEMS puts it back and writes down that it happened.

  • Nothing to install on site
  • Connects to your inverter portal
  • Every command audited
Day-ahead price vs. commanded limit BG · 15 Aug 2026 · 15-min intervals · source ENTSO-E
Lowest price €1.03/MWh 14:45
Your floor €20.00/MWh per account
Intervals curtailed 26/96 6 h 30 m
Re-armed mid-day 1× 10:45 – 11:30

Real prices, as ENTSO-E published them and CEMS stored them. The limit trace is what the engine commands at a €20/MWh floor with a plant bounded 0–100%. Note 10:45: the market lifted above the floor for forty-five minutes and CEMS put the plant back to full output, then curtailed it again. A rule that fires once a day would have missed both edges.

How the figure was calculated

A real plant, its real invoices, the months that would have cost the most.

The comparison is between the average price at which the plant sells each MWh when it is stopped under a 15 €/MWh floor, and the price when it runs through every hour. The price is the one the trader actually paid — the day-ahead price less the trader's fee.

  • Curtailed — the plant runs only while the day-ahead price is 15 €/MWh or more. The moment the price falls below that, CEMS stops it, so no energy is sold at a loss. Prices and volumes come from the trader's real settlements and invoices.
  • Left running is the same plant producing in every hour, low and negative prices included. What it would have produced in the hours it was stopped is estimated from the sunshine at the site, and checked against the real invoices of similar plants that are never stopped.
  • Months of low prices are those in which at least 40% of the energy would have sold under the floor, some of it below zero.

Between the decision and the inverter

Three things go wrong, and none of them are the maths.

Deciding to curtail is arithmetic: a price, a floor, a comparison. Everything expensive happens after that, in the gap between a decision and an inverter four hundred kilometres away.

The command never landed

A call fails. A token expired overnight. The request timed out. A system that assumes its own success reports a curtailed plant that produced all afternoon at full output.

CEMS A send that failed is not recorded as a new state. The engine knows it does not know, retries on the next tick, and the audit row says power limit failed with the vendor's own error.

Something else moved it

An inverter is shared infrastructure. A site EMS, an installer's app, a home automation box — anything with the credentials can write the same register, and none of them tell you. Your limit is quietly gone.

CEMS Every two minutes the engine reads the limit back. If the hardware disagrees with what CEMS believes, that is drift: it re-asserts the value and logs power limit drifted with what it found.

Nobody can say what happened

A month later the trader asks why the plant was down between two and four. "The software curtailed it" is not an answer. Which price? Against which floor? Did it reach the inverter, or only the log?

CEMS Every command carries the price, the floor, the rule and the outcome into an audit log the account owner reads themselves. Including the commands that were deliberately not sent, and why.

The control loop

Four steps, every thirty seconds.

Each step consumes the one before it, and the last feeds back into the first. It runs continuously, on its own, all day — and if it ever stops running, that is something you are told rather than something you find out from a bill.

  1. 01

    Read the market

    Day-ahead prices for your bidding zone (in Bulgaria, the IBEX day-ahead market), at the 15-minute settlement interval the market actually clears on — not an hourly average that hides the two quarters that went negative.

  2. 02

    Decide against your floor

    One floor per account, read once per cycle so two plants of the same owner can never be judged against different numbers. Under the floor is curtail, and the decision is written down before anything is attempted.

  3. 03

    Command a level, not an event

    CEMS writes a percentage of rated power to each inverter — per device, so a plant with four inverters gets four limits and not one blanket switch. Writing the same value twice leaves one state, so it is always safe to re-assert. Nothing is sent when the hardware already agrees.

  4. 04

    Read it back the difference

    A written value is not a held value. CEMS re-reads the limit from the inverter and compares. Agreement refreshes the belief; disagreement is drift, and drift is re-asserted and logged. This is the step that turns "we sent the command" into "the plant is at 0%".

Audit trail

Rows you can hand to a trader.

Not a debug log. The account owner opens this themselves, and every row names the price and the rule that produced it — including the rows where CEMS decided to curtail and deliberately sent nothing.

Time Action Detail Actor
09:15:02 curtail price €12.79 under floor €20.00 · interval 09:15 engine
09:15:04 power limit set 4 inverters → 0% of rated · SolisCloud accepted engine
09:23:31 power limit drifted expected 0%, found 85% · re-asserted engine
10:45:01 produce price €21.30 over floor €20.00 · interval 10:45 engine
11:45:00 curtail NOT SENT the plant is in dry_run, not armed engine
12:02:18 derating changed inverter 2 max 100% → 103% ivan@…

Illustrative rows, in the shape and vocabulary CEMS actually writes. The fifth is the one most systems have no way to express: a decision that was correct and a command that was withheld, saying which switch withheld it.

Rollout

You do not arm a fleet. You arm one plant.

Every plant arrives switched off and moves forward one deliberate step at a time. The middle step is the one that matters: real prices, real decisions, real audit rows, real hardware — and nothing written to it.

Monitor only

Telemetry and margin. The engine does not even consider the plant.

Dry run

Decided, logged and audited — and incapable of sending. A plant in dry run cannot be curtailed by CEMS, and not because a check happened to pass. Watch a week of it before you let it touch anything.

Armed

Commands go out, and the read-back confirms them.

None of it is one-way. A plant you have armed goes back to dry run in a click, and the log records who moved it and when — so holding a site still for an afternoon is a decision you make yourself, not a support ticket.

Supported hardware

A make is listed when experiment has confirmed that CEMS can control its inverters.

Cloud
SolisCloud
Control
Active power limit, per inverter
Range
0 – 110% of rated
Read-back
Verified against hardware

110% is not a typo. Solis accepts a limit above nameplate, which is worth having on a DC-oversized array — so CEMS allows it there and stops at 100% everywhere else, rather than clamping the plants that were configured for it.

How CEMS commands a Solis inverter

Cloud
FusionSolar
Control
Active power limit, per inverter
Range
0 – 100% of rated
Read-back
Verified against hardware

The limit lands on the inverter itself, so a plant with no export meter can still be curtailed — the case a feed-in cap cannot cover. Needs a FusionSolar account with installer rights.

How CEMS commands a Huawei inverter

Cloud
SOLARMAN Business
Control
Active power limit, per inverter
Range
0 – 110% of rated
Read-back
Verified against hardware

Not a make of inverter but the platform a great many makes report through, over the logger already on the wall. This one acknowledges commands it has not carried out — so the receipt is ignored and the setting is read back off the hardware instead.

How CEMS commands an inverter behind a SOLARMAN logger

Cloud
Elekeeper
Control
Active power limit, per inverter
Range
0 – 100% of rated
Read-back
Verified against production

The one route here with no read-back: SAJ's cloud confirms that it sent a command and will not say what the inverter now holds. So this one is checked against measured production, which is weaker — and its own page says so before you arm anything.

How CEMS commands a SAJ inverter

Cloud
Solplanet Pro
Control
Active power limit, per inverter
Range
0 – 100% of rated
Read-back
Verified against hardware

AISWEI's published interface only reads; the installer console is the surface that commands. A read taken straight after a write echoes the value on its way to the inverter, so CEMS re-reads later and cross-checks production.

How CEMS commands a Solplanet inverter

Cloud
RENAC SEC
Control
Active power limit, per inverter
Range
2 – 100% of rated
Read-back
Verified against hardware

The range stops at 2% because zero switches a RENAC off, and the logger that would carry the command back is powered from the inverter. CEMS enforces that floor rather than offering a setting that takes a plant off the air.

How CEMS commands a RENAC inverter

Route
Sunny WebBox, on site
Control
Active power limit, per inverter
Range
0 – 100% of rated
Read-back
Verified against hardware

The only make here reached without a cloud account: CEMS writes to the Sunny WebBox already in the plant room. That box reports success three different ways, so a command counts as delivered only when what came back matches what was sent.

How CEMS commands an SMA inverter

A manufacturer appears on this page when CEMS can command its inverters and we have watched the limit hold on real hardware, on a real site. Not when we can read a plant — reading is the easy half, and it proves nothing about control.

Reading and commanding are not the same problem, and a logo strip flattens them into one promise. We would rather name one make we have driven than ten we have only watched, because the difference between the two only shows up on the first negative-price afternoon, which is the worst moment to find it.

This list is going to grow, and it grows one proof at a time. Every make on it faced the same test — commands out, the effect confirmed on the machine, the limit watched holding on real hardware. What sets the order is the same thing every time: a manufacturer whose platform we have learned properly, and an owner willing to let us prove it on their site.

Running something else? Tell us what you have — the make, the cloud and whether your installer gave you API credentials is enough for us to say honestly whether it can be controlled.

Getting started

No box on the wall. No electrician, no site visit.

CEMS reaches your inverters the same way you already do — through the manufacturer's own portal. You connect that account once, your plants and their inverters appear on their own, and you set a price floor. There is nothing to wire in, nothing to mount in the cabinet, and no second visit from an installer when you add the next site.

From there it is a service, and keeping it running is our problem. The market feed, the connection to your vendor's cloud, the fact that today's decisions actually happened on a Sunday in August — that is ours to watch, not something that lands on whoever at your company is nearest a laptop.

  • Connect once, then it runs. Add your inverter portal account and CEMS finds the plants, the inverters and their ratings itself. Minutes, not a commissioning project.
  • Every site on one screen. Plants in different places, of different makes and sizes, read as one fleet with one set of numbers underneath them.
  • Your history is yours. Production, prices and margin kept for as long as you need them, and yours to take out whenever you ask — not rented back to you one dashboard at a time.
  • Your portal logins are protected. The credentials CEMS uses to reach your inverters are encrypted before they are stored, and never held in the clear.
  • One customer never sees another. An installer looking after ten owners keeps ten separate sets of books, each visible only to the people who should see it.

Questions

What plant owners ask first.

How do I stop my solar plant during negative prices?

Connect the inverter portal you already use to CEMS once and set a price floor. Whenever the day-ahead price falls under it — every negative quarter-hour included — CEMS limits the inverters, and returns them to full output when the price recovers. Nothing is installed on site.

Does CEMS work with the Bulgarian IBEX market?

Yes. CEMS reads the day-ahead prices of the Bulgarian bidding zone, the market IBEX operates, as ENTSO-E publishes them, at the 15-minute interval the market clears on.

Which inverters can CEMS curtail?

Inverters from Solis, Huawei, SAJ, Solplanet, RENAC and SMA, and any inverter behind a SOLARMAN logger. A make is listed only once its control has been proven on real hardware.

Does CEMS switch the inverters off?

No. It sets an active power limit, a percentage of rated power, so nothing is switched off and nothing has to be restarted. Most makes go down to 0%; RENAC stops at 2% so the inverter stays online.

How do I know the inverter obeyed?

After every command CEMS reads the limit back off the inverter. Where a make cannot report its setting, as with SAJ, it checks measured production instead. If something else moves the limit, CEMS puts it back and records that it happened.

What does it cost?

CEMS costs €65 per inverter per year, excluding VAT, and the first 30 days are free. See pricing.

Negative prices are not an anomaly any more. They are the middle of a sunny day.

On 15 August 2026 the Bulgarian market spent six and a half hours under €20/MWh and bottomed at €1.03. That is the day your plant works hardest.