Solplanet inverters, curtailed on the day-ahead price and checked on the inverter after every command.
CEMS reaches Solplanet through the installer platform, the console a commissioning engineer already works in. No gateway on site, no local Modbus, no second box in the cabinet. What follows is what CEMS commands, what it reads and what it needs from you.
- Cloud
- Solplanet Pro
- Credentials
- Account and password
- Granularity
- Per inverter
- Range
- 0 – 100% of rated
- Read-back
- Verified against hardware
The control path
A limit, not a shutdown.
CEMS holds a Solplanet inverter at a percentage of its rated power while the price is under your floor, and returns it to full when the price recovers. Nothing is switched off and nothing has to be restarted.
Proven on real hardware on 3 September 2026, on a 30 kW machine: commanded down, held there against measured production, and released.
What CEMS reads
Every string, every inverter, every five minutes.
| Reading | Level |
|---|---|
| Active power | Plant and inverter |
| Energy today and lifetime | Plant and inverter |
| Grid frequency | Inverter |
| Inverter temperature | Inverter |
| Operating state and fault code | Inverter |
| DC voltage, current and power, per MPPT | Inverter |
| DC current, per string | Inverter |
Before it can work
The account you already have, and the right region.
-
01
Use the Solplanet account that monitors the plants
The same account and password used in the installer console. There is nothing to request from AISWEI, no developer application, and no key to wait for.
-
02
Pick the region the account was created in
Europe or international. The two platforms do not share data, and the wrong one refuses a perfectly correct password.
-
03
Import only the plants you look after
An installer login lists every plant that installer manages, including other owners'. Only the plants you import are ever polled, and only the ones you arm are ever commanded.
-
04
Check the machine may be commanded
Whether a login is allowed to control a given inverter is the platform's decision, not ours, and CEMS asks it per device rather than assuming. Then rehearse: a new plant starts in dry run, deciding exactly as it would in earnest and sending nothing.
Read this if anything else already reaches your inverters
Anything else that sets this limit will fight CEMS.
An inverter is shared infrastructure. A site controller, an installer's app, a home automation box, a script somebody wrote two years ago — any of them with access can move the same power limit, and none of them announce it.
Which is the honest answer rather than the comfortable one: turn the other automation off for the plants CEMS looks after. Two systems commanding one setting is not a configuration, it is a race.
Questions
Questions owners ask.
Can Solplanet inverters be curtailed remotely?
Yes. CEMS sets an active power limit on each Solplanet inverter through the Solplanet Pro installer platform, anywhere from 0 to 100% of rated, reads it back off the hardware and cross-checks it against production. Nothing is installed on site.
When does CEMS curtail them?
When the day-ahead price for your bidding zone — in Bulgaria, the IBEX day-ahead market — turns negative or falls under the floor you set. When the price recovers, the inverters go back to full output.
What does it cost?
Each inverter is €65 a year, excluding VAT, and the first 30 days are free. See pricing.
Stop selling energy at a loss. Connect your Solplanet plant and try it without risk.
A new plant starts in dry run: CEMS makes every decision it would make in earnest and sends nothing, so you see exactly what it would do before it does it.