CEMS by Uncloud БГ Open CEMS

SAJ inverters, curtailed on the day-ahead price and checked against what the plant actually produced.

CEMS talks to SAJ through Elekeeper, the cloud the owner or the installer already signs in to. No gateway on site, no local Modbus, no second box in the cabinet. What follows is what CEMS commands, how long a command takes to arrive, and what it needs from you.

Cloud
Elekeeper
Credentials
Account and password
Granularity
Per inverter
Range
0 – 100% of rated
Read-back
Verified against production

The control path

A limit, not a shutdown.

CEMS derates a SAJ inverter to a percentage of its rated power and restores it by setting that percentage back up. Nothing is turned off and nothing has to be started again.

Proven on real hardware on 2 September 2026: a 33 kW inverter was curtailed almost to zero and went back to full output within a minute of being released.

What to expect

A command is a queued task. Minutes, not seconds.

SAJ does not hand a setting straight to the inverter. The cloud queues it, the inverter collects it, and the whole trip has been measured at roughly four to eight minutes on real hardware — in both directions.

What CEMS reads

Every string, every inverter, every five minutes.

Telemetry CEMS collects from Elekeeper
Reading Level
Active powerPlant and inverter
Energy today and lifetimePlant and inverter
Inverter temperatureInverter
Operating stateInverter
Nameplate ratingInverter
DC current, per stringInverter

Before it can work

The account you already have, and the right region.

  1. 01

    Use the Elekeeper account that monitors the plants

    The same username and password used in the portal or the app. An installer login works and is common; there is nothing to request from SAJ and nothing to enable first.

  2. 02

    Pick the region the account was created in

    SAJ runs separate clouds that do not share data, and the wrong one refuses a perfectly correct password. Europe, international, or mainland China.

  3. 03

    Import only the plants you look after

    An installer login lists every plant that installer commissioned, including other owners'. Only the plants you import are ever polled, and only the ones you arm are ever commanded.

  4. 04

    Rehearse before you arm

    A new plant starts in dry run. The engine decides exactly as it would in earnest and writes the audit row it would have written, but sends nothing to the inverter. Watch it for a few days, then switch it on.

Read this if anything else already reaches your inverters

Anything else that sets this limit will fight CEMS.

An inverter is shared infrastructure. A site controller, an installer's app, a home automation box, a script somebody wrote two years ago — any of them with access can move the same power limit, and none of them announce it.

So the honest advice, not the comfortable one: turn the other automation off for the plants CEMS looks after. If you are not sure what else can reach your inverters, that is worth an hour with your installer before it is worth an argument with a trader.

Questions

Questions owners ask.

Can SAJ inverters be curtailed remotely?

Yes. CEMS sets an active power limit on each SAJ inverter through the Elekeeper cloud, anywhere from 0 to 100% of rated. SAJ does not report the setting back, so CEMS checks it against the production the plant actually measured. Nothing is installed on site.

When does CEMS curtail them?

When the day-ahead price for your bidding zone — in Bulgaria, the IBEX day-ahead market — turns negative or falls under the floor you set. When the price recovers, the inverters go back to full output.

What does it cost?

Each inverter is €65 a year, excluding VAT, and the first 30 days are free. See pricing.

Stop selling energy at a loss. Connect your SAJ plant and try it without risk.

A new plant starts in dry run: CEMS makes every decision it would make in earnest and sends nothing, so you see exactly what it would do before it does it.